Ballast Bags Attached to Mechazilla’s Chopsticks for Load Testing | SpaceX Boca Chica
Ballast bags were attached to the Chopsticks, the yellow Buckner LR 11000 crane lowered its boom, and scrapping of Booster 3 continued.
Video and Pictures from Mary (@BocaChicaGal) and Nic (@NicAnsuini). Edited by Jack (@theJackBeyer).
All content copyright to NSF. Not to be used elsewhere without explicit permission from NSF.
Click “Join“ for access to early fast turnaround clips, exclusive discord access with the NSF team, etc - to support the channel.
Rolling Updates and Discussion:
Articles:
NSF Store:
L2 Boca Chica (more clips and photos) from BC’s very early days to today.
(Join L2 and support NSF here: )
0:00 - Sunrise
0:28 - Ship 21 Nosecone and Wide Bay Construction
0:42 - Wide Bay Construction
18 views
12
5
3 years ago 00:12:10 122
Mechazilla’s Chopsticks Load Tested with Water Ballast Bags | SpaceX Boca Chica
3 years ago 00:16:40 18
Ballast Bags Attached to Mechazilla’s Chopsticks for Load Testing | SpaceX Boca Chica
9 years ago 00:12:57 35
Liquid Force - How WakeSurf: Wake Surfing 101, ballast, getting up, starting out
9 years ago 00:04:44 1
How To Model Realistic Ballast - Model Scenery | Woodland Scenics
3 years ago 00:15:58 14
Two Prefabricated Wide Bay Sections Lifted Into Place | SpaceX Boca Chica